Nieco JF64 Manuale Utente

Navigare online o scaricare Manuale Utente per Forno Nieco JF64. Nieco JF64 User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 0
W A R N I N G :
Improper installation, adjustment, alteration, maintenance can cause property damage, injury, or death.
Read the installation, operating and maintenance instructions thoroughly before installing or servicing
this equipment.
F O R Y O U R S A F E T Y :
Do not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other
appliance.
A P P ROVALS:
IMPORTANT: RETAIN THIS MANUAL IN A SAFE PLACE FOR FUTURE REFERENCE
Broiler area must be kept free of combustible materials, and the flow of combustion and ventilation air
must not be obstructed. Operating personnel must not perform any maintenance or repair
functions. Contact your Nieco Authorized Dealer.
Model JF64-3 Gas
Owner’s Manual
BroilVection
Vedere la pagina 0
1 2 3 4 5 6 ... 31 32

Sommario

Pagina 1 - BroilVection

W A R N I N G :Improper installation, adjustment, alteration, maintenance can cause property damage, injury, or death.Read the installation, operating

Pagina 2 - TABLE OF CONTENTS

10C.2 Lighting Procedures1. Broiler is centered under hood and plugged in2. Gas valve is open when handle is in line (parallel to) the pipe3. Turn ve

Pagina 3 - A. GENERAL INFORMATION

11C.2 Lighting Procedures (Continued.)MANUAL IGNITION Nieco Corporation - Model JF64-3G1. Allow the broiler to run free of any product for 10 minutes

Pagina 4

12Nieco Corporation - Model JF93G2. TEMPERATURE CONTROLGas broilers are equipped with a Broil Temperature Stabilizer Control that senses when thebroil

Pagina 6 - B. INSTALLATION

14Nieco Corporation - Model JF64-3GInstructions1. Allow the broiler to run free of product for 10minutes before turning it off. This allows anyresidue

Pagina 7

15Nieco Corporation - Model JF64-3G1. Slide grease pan out.Make sure grease pan is cool before putting inwater or it may warp the pans.2. Take to sink

Pagina 8 - B.10 Pre-Operation Check

16Nieco Corporation - Model JF64-3G1. Slide Shield out.2. Take to sink area and spray with degreaser. 3. Wash with a scrub pad, rinse, and sanitize in

Pagina 9 - C. OPERATION

17Nieco Corporation - Model JF64-3G1. Clean product holding area while still warm.2. Wring out a soapy towel and wash productholding area.3. Wring out

Pagina 10 - PRE-LIGHTING PREPARATION

18Nieco Corporation - Model JF64-3G1. Lift Insert out of Catch Pan then Remove Pan.2. Take to sink area and spray with degreaser. 3. Wash, rinse, and

Pagina 11 - EMERGENCY SHUTDOWN

19Nieco Corporation - Model JF64-3G1. Remove the grease box.2. Take to sink area and spray with degreaser.3. Wash with a scrub pad, rinse, and sanitiz

Pagina 12 - C.4 Control Operation

2TABLE OF CONTENTSA. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3A.1 Description . . .

Pagina 13 - D. CLEANING AND DISASSEMBLY

20Nieco Corporation - Model JF64-3G3-Compartment Sink1. Lift the burner latch.2. Slide burner out.3. Take to the 3-compartment sink and scrub witha sc

Pagina 14 - Instructions

21Nieco Corporation - Model JF64-3GEXTREMELY HOT! Be careful not to burnyourself. 1. Lift Incendalyst™ chimney up and off.2. Take to sink area and spr

Pagina 15

22Nieco Corporation - Model JF64-3G1. Use a flat head screwdriver or box cutter toclean the slots on the pilot orifices.Pilot OrificesInteriorToolsIns

Pagina 16

23Nieco Corporation - Model JF64-3G1. Lift air upper burner and air box from the top ofthe broiler. It is not necessary to detach them.2. Use a stiff

Pagina 17

24Nieco Corporation - Model JF64-3G1. Scrape shaft of each belt on the discharge endwith the wide end of the shaft cleaning tool. Thetool is located o

Pagina 18

E. TROUBLESHOOTINGAlways verify that the broiler is properly assembled, the hood is on, gas valve open and broiler is plugged in.Nieco Corporation - M

Pagina 19

26Nieco Corporation - Model JF64-3GF. PARTS LOCATION DRAWINGSDischarge End ViewHEAT SHIELD22718HEAT SHIELD22942GREASE PAN,FEEDER EXT.23451GREASE PAN,

Pagina 20 - Heat Resistant Gloves

F. PARTS LOCATION DRAWINGSFeed End View27Nieco Corporation - Model JF64-3GINCENDALYST20860HOOD, DOUBLE22729HEAT REFLECTOR23430AIR BOX FRONT23042AIR BO

Pagina 21

28Nieco Corporation - Model JF64-3GG. PARTS REPLACEMENT LISTPART NO DESCRIPTIONAIR BOX COMPONENTS21214 CONNECTOR FLEX, 3/4 x 24"23430 HEAT REFLEC

Pagina 22 - Screwdriver

29Nieco Corporation - Model JF64-3GG. PARTS REPLACEMENT LISTBELT DRIVE SYSTEM & BEARINGS6027 #35 DRIVE CHAIN6048 MASTER LINK Assy6046 TEFLON BEARI

Pagina 23

3A. GENERAL INFORMATIONA.1 DescriptionThe Nieco®Model JF64-3G automatic broiler features high release convection burners, Patent pendingBroilVection™

Pagina 24 - Shaft Cleaning Tool

G. PARTS REPLACEMENT LISTMISCELLANEOUS20860 INCENDALYST, 15.19" X 8" X 1.5", 29 CPI20058 PERF TOP23307 CLEANING BRUSH, JF23265 TOOL, CO

Pagina 25 - E. TROUBLESHOOTING

31Nieco Corporation - Model JF64-3GH. WIRING DIAGRAMS115V Wiring4Sept12BModel Rev.This document is the property of Nieco Corporation. Reporduction or

Pagina 26 - F. PARTS LOCATION DRAWINGS

32CAUTIONAll electrical connections must bein accordance with local electricalcodes and any other applicablecodes.CAUTIONDo not operate the broiler at

Pagina 27

4A.3 Service/Technical AssistanceIf you experience any problems with the installation or operation of your broiler, contact your localAuthorized Niec

Pagina 28 - G. PARTS REPLACEMENT LIST

5A.4 Important Safety Information (Continued.)In addition to the warnings and cautions in this manual, use the following guidelines for safe operatio

Pagina 29

6Nieco Corporation - Model JF64-3GB. INSTALLATIONB.1 Pre-InstallationUncrate the broiler and inspect for shipping damage. Remove the tape securing t

Pagina 30

7B.6 Gas Connection- 3/4” N.P.T. At rated input the gas supply should deliver a minimum pressure of at least 15 mbar (6" water column)at the bro

Pagina 31 - H. WIRING DIAGRAMS

8Nieco Corporation - Model JF64-3GB.9 Electrical Connection Power requirements are stated on the unit nameplate and must be connected accordingly. Th

Pagina 32 - I. SPECIFICATIONS

3. Main on/off switch. Used to turn the power on or off to the broiler.4. Power indicator light. Glows green when the power to the broiler is turned o

Commenti su questo manuale

Nessun commento